SOLENOID VALVE REMOVAL/INSTALLATION [JA5A-EL]


BME051721280204

1. Remove the control valve body. (See CONTROL VALVE BODY REMOVAL/INSTALLATION [JA5A-EL].)

2. Remove the solenoid valves and manual valve.

1
Manual valve
2
2-4 brake solenoid valve
3
Neutral shift solenoid valve
4
TCC solenoid valve
5
Shift solenoid C
6
Shift solenoid B
7
Reduction timing solenoid valve
8
Shift solenoid A
9
Pressure control solenoid
10
High clutch solenoid valve

3. Apply ATF to a new O-ring and install it on the solenoid valve.

4. Install the solenoid valve and manual valve in the control valve body.

Tightening torque
8.34-10.30 N·m {85-105 kgf·cm, 74-91 in·lbf}

5. Install the control valve body. (See CONTROL VALVE BODY REMOVAL/INSTALLATION [JA5A-EL].)

6. Add the ATF while the engine is idling, and inspect the ATF level and leakage. (See AUTOMATIC TRANSAXLE FLUID (ATF) REPLACEMENT [JA5A-EL].) (See Automatic Transaxle Fluid (ATF) Level Inspection.)

7. Perform the time lag test and line pressure test. (See MECHANICAL SYSTEM TEST [JA5A-EL].)