FRONT LOWER ARM INSPECTION
BME021334310W02
1. Remove the lower arm from the vehicle.
2. Inspect for damage, cracks, and bending.
3. Inspect the ball joint rotation torque.
-
(1) Rotate the ball joint five times.
-
(2) Connect the SST to the ball stud, and measure the rotation torque using a pull scale.
-
• If not within the specification, replase the lower arm component.
Ball joint preload
-
1.0-4.9 N·m {10-50 kgf·cm, 9-43 in·lbf}
Pull scale reading
-
10-49 N {1.0-5.0 kgf, 3-11 lbf}