1. Remove the VBC check valve. (See INTAKE-AIR SYSTEM HOSE ROUTING DIAGRAM [MZR-CD (RF Turbo)].)
2. Blow through port A and verify that the air flows from port B.
3. Blow through port B and verify that the air does not flow from port A.