1. Assemble in the order indicated in the table.

|
1 |
Cylinder head gasket |
|
2 |
Cylinder head |
|
3 |
Cylinder head bolt |
|
4 |
Tappet |
|
5 |
Camshaft (See Camshaft Assembly Note) |
|
6 |
Camshaft cap |
|
7 |
Camshaft sprocket, Variable valve timing actuator (L3 (with variable valve timing mechanism)) |
|
8 |
Oil control valve (OCV) (L3 (with variable valve timing mechanism)) |
1. Tighten the cylinder head bolts in the order indicated in the figure in six steps.
1. Install the camshaft with No.1 cylinder aligned with TDC position.
2. Tighten the camshaft cap bolt using the following two steps.

1. Camshaft sprocket or variable valve timing actuator (L3 (with variable valve timing mechanism)) attachment bolt is changed into the state of a temporary bundle by hand until it attaches timing chain.
2. The attachment bolt of camshaft sprocket or variable valve timing actuator (L3 (with variable valve timing mechanism)) is bound tight for timing chain after attachment.
L8, LF, L3
N·m {kgf·m, ft·lbf}
L3 (with variable valve timing mechanism)
N·m {kgf·m, ft·lbf}